Historical version 11 of Tamsin (view current version)

I really should get around to putting some stuff here.

previous stuff I've made is at http://www.tamsin.com/etc/

Finished Things

  • The burgundy (the wool band says 'damson') arran double knit jumper. Took me about 3 months.

Current Projects:

  • The bead knitted bag, which I need to line and put together.
  • All manner of bead bits and bobs, including another knitted bag.
  • An Ehrman needlepoint cushion front that I recently got back again after leaving at an exboyfriends for around 5 years. I think its a Candace Bahouth design. Its has mythical creatures from the star maps on it.

Can't find it on http://www.ehrmantapestry.com/ so I guess its an out of print design now.

  • A red and gold short cheongsam dress that I need to hem, fix the sleeve linings and find some black frog closures for.

Things I should start once I've finished one of the Current Projects.

  • Silk cocoon coat. - I have a lot of old silk shirts thaT I never wear and I'm thinking of recycling them into a patchwork silk coat.
  • Purple Acrylic Mohair Jumper.
  • Silk/Cotton Hand Dyed Cardigan. This wont get started on until the spring because its now jumper season.

Oh and here is my [Yarn Stash]?

This is version 11 (as of 2004-04-04 22:07:35). View current version. List all versions.